AHTS/Icebreaker BALDER Viking - Job Reference List
AGR
Period: November 3, 2008 - November 7, 2008
Work: Rig move Paul B Lloyd Jr. UKCS
![]()
Nexen
Period: October 15, 2008 - November 3, 2008
Work: Rig move Transocean Prospect UKCS followed by AGR Paul B. LLoyd Jr.
![]()
Total
Period: October 8, 2008 - October 15, 2008
Work: Rig move GA on Sailor UK Block 9 UKCS
![]()
ADTI
Period: September 23, 2008 - October 8, 2008
Work: Rig move GAII UKCS from Irish Block 50 to North Sea
![]()
Diamond Offshore
Period: September 21, 2008 - September 23, 2008
Work: Rig move Ocean Nomad from Ross UK Block 13/28 to Invergordon anchorage
![]()
Talisman
Period: September 19, 2008 - September 21, 2008
Work: Ocean Nomad from Ross UK Block 13/28 UKCS
![]()
AGR/CoP
Period: September 12, 2008 - September 19, 2008
Work: Rig move Ensco 100 thereafter Talisman UKCS
![]()
Team
Period: September 7, 2008 - September 10, 2008
Work: Rig move Safe Bristiolia UKCS from Block 16/26 to shore.
![]()
AGR
Period: September 4, 2008 - September 7, 2008
Work: Cargo run UKCS followed by Team/Safe Bristolia.
![]()
Talisman
Period: August 29, 2008 - September 1, 2008
Work: Rig move of Ocean Princess UKCS From Tain Block 13/23 to McDonald Block 14/25
![]()
BP
Period: August 15, 2008 - August 23, 2008
Work: Rig move Transocean Rather UKCS infield Foinhaven
![]()
Nexen
Period: August 11, 2008 - August 14, 2008
Work: Rig move Glomar Arctic IV UKCS Block 20/2
![]()
ADTI
Period: July 26, 2008 - August 6, 2008
Work: Rig move GAII from North Sea to Irish sector.
![]()
AGR
Period: July 24, 2008 - July 26, 2008
Work: Rig move GA II UKCS
![]()
Shell UK
Period: July 10, 2008 - July 11, 2008
Work: General duties (cancelled) UKCS
![]()
Nexen
Period: June 24, 2008 - July 9, 2008
Work: Rig move Galaxy 3 UKCS from Buzzard field to Esbjerg
![]()
AGR Peak
Period: June 15, 2008 - June 19, 2008
Work: Rig move Sedco 704 UKCS from block 16/21b to block 16/26a
![]()
Oilexco
Period: June 12, 2008 - June 15, 2006
Work: Rig move Sedco 712 UKCS followed by AGR/Sedco 704
![]()
Maesk Oil UK
Period: May 22, 2008 - May 28, 2008
Work: Rig move GA II UKCS from North Gryphon to Bladon
![]()
AGR
Period: April 19, 2008 - April 28, 2008
Work: Rig move Bredford Dolphin NOCS
![]()
BP
Period: March 26, 2008 - April 19, 2008
Work: Rig move Transocean Rather UKCS West of Shetland from Block 6005/13 to Foinaven
![]()
AGR Petroleum
Period: May 5, 2008 - May 14, 2008
Work: R/M of Sedco 704 UKCS from Rinnes to Delta
![]()
Oilexco
Period: February 20, 2008 - March 15, 2008
Work: Rig move Ocean Guardian UKCS from Block 15/23 to 23/21
![]()
Talisman
Period: February 14, 2008 - February 18, 2008
Work: R/M of 'Ocean Princess' UKCS from block 30/16 to Blane field
![]()
Oilexco
Period: February 11, 2008 - February 13, 2008
Work: Rig move Sedco712 UKCS from UK block 22/14 to Brenda location block 15/25
![]()
BG
Period: January 27, 2008 - February 11, 2008
Work: Rig move Borgholm Dolphin UKCS from Invergordon to Armada location.
![]()
Team Marine
Period: January 17, 2008 - January 18, 2008
Work: Rig move Paul B. Lloyd Jr. West of Shetland
![]()
BP UK
Period: January 4, 2008 - January 17, 2008
Work: R/M of Paul B Lloyd Jr UKCS West of Shetland
![]()
AGR Petroleum Services
Period: December 20, 2007 - January 2, 2008
Work: R/M of 'Bredford Dolphin' UKCS
![]()
ADTI
Period: December 13, 2007 - December 20, 2007
Work: Rig move Galaxy II UKCS from Block 21/8 to 12/17
![]()
BG
Period: November 22, 2007 - December 9, 2007
Work: Rig move NTVL & Borgholm Dolphin UKCS
![]()
BP
Period: November 15, 2007 - November 22, 2007
Work: Rig move Paul B. Lloyd jr. UKCS from 206/8 to 204/23 West of Shetland.
![]()
AGR
Period: November 4, 2007 - November 15, 2007
Work: R/M of Bredford Dolphin NORCS From 16/1-8 to 14/12-5
![]()
Senergy
Period: October 23, 2007 - November 3, 2007
Work: Rig move Stena Spey UKCS from UK Block 14/18 to Block 211/18
![]()
Team
Period: October 3, 2007 - October 7, 2007
Work: Rig move Safe Scandinavia UKCS on Britannia
![]()
BG
Period: October 1, 2007 - October 3, 2007
Work: Rig move Rowan Gorilla 6 UKCS from UK Block 22/17 to Block 30/2
![]()
Nexen
Period: October 12, 2007 - October 16, 2007
Work: Rig move Borgsten Dolphin UKCS Rig move from Block 15/19 to 20/2
![]()
Talisman
Period: September 27, 2007 - January 19, 2007
Work: Rig move Rowan Gorilla IV UKCS Arbroath Field
![]()
Talisman
Period: September 17, 2007 - September 24, 2007
Work: Rig move Ocean Princess UKCS from UK Block 15/16 to Block 30/16
![]()
BP UK
Period: September 6, 2007 - September 14, 2007
Work: R/M of 'Paul B Lloyd Jr.' UKCS West of Shetland
![]()
Technip
Period: August 27, 2007 - September 1, 2007
Work: DP heading control CSO Apache UKCS on Wissey Field UK Block 53/4d
![]()
Norsk Hydro
Period: August 12, 2007 - August 27, 2007
Work: Rig move Deepsea Trym NOCS
![]()
CNR
Period: August 4, 2007 - August 8, 2007
Work: R/M og 'Byford Dolphin' UKCS
![]()
BP UK
Period: July 28, 2007 - August 4, 2007
Work: R/M of Paul B Lloyd Jr. UKCS West of Shetland
![]()
Oilexco
Period: July 20, 2007 - July 23, 2007
Work: Rig move Ocean Guardian UKCS From Block 15/29 to 22/2
![]()
Island Oil & Gas
Period: July 1, 2007 - July 18, 2007
Work: Rig move Petrolia EICS from Irish CS Block49/23 to 57/2-3
![]()
Shell
Period: June 23, 2007 - July 1, 2007
Work: Rig move Sedco 711 EICS from Corrib P5 to Corrib P6.
![]()
Apache
Period: June 18, 2007 - June 21, 2007
Work: Supply duties UKCS
![]()
Talisman Norway
Period: June 8, 2007 - June 18, 2007
Work: Rig move Maersk Giant NOCS from Mime to Rev locatin
![]()
Talisman
Period: June 3, 2007 - June 7, 2007
Work: Rig move Ocean Nomad UKCS
![]()
Nexen
Period: May 15, 2007 - May 18, 2007
Work: R/M of 'John Shaw' UKCS Infield on Buzzard
![]()
Shell
Period: May 8, 2007 - May 12, 2007
Work: Rig move J.W. McLean UKCS
![]()
BP UK
Period: April 22, 2007 - April 28, 2007
Work: Rig move Paul B Lloyd jr UKCS Infield West of Shetland
![]()
Statoil
Period: April 9, 2007 - April 16, 2007
Work: Rig move Ocean Vanguard NOCS
![]()
Norsk Hydro
Period: March 29, 2007 - April 9, 2007
Work: Rig move Deepsea Trym & Songa Dee NOCS Oseberg & Troll infield rigmoves
![]()
Talisman
Period: March 23, 2007 - March 25, 2007
Work: Rig move "GA II" UKCS from Wood location Block 22/18
![]()
Total
Period: March 22, 2007 - March 23, 2007
Work: Cargo run UKCS
![]()
Shell UK
Period: March 7, 2007 - March 17, 2007
Work: Rig move UKCS from Galleon PG Block 48/14 to Inde L 49/24, start Team 19.03
![]()
Talisman
Period: February 28, 2007 - March 3, 2007
Work: Rig move UKCS from Sligachen to Scapa
![]()
BP
Period: February 19, 2007 - February 21, 2007
Work: Cargo run. UKCS
![]()
Talisman
Period: February 9, 2007 - February 16, 2007
Work: Rig move UKCS from Arkwright to Wood location
![]()
Talisman
Period: February 3, 2007 - February 8, 2007
Work: R/M of 'Ocean Princess' UKCS From Burghley to Duart
![]()
Nexen
Period: January 31, 2007 - February 3, 2007
Work: R/M of 'Safe Caledonia' UKCS from Buzzard field to Bergen
![]()
CNR
Period: January 23, 2007 - January 28, 2007
Work: Supply duties UKCS
![]()
Nexen Petroleum
Period: January 15, 2007 - January 17, 2006
Work: Supply Duties UKCS to GSF Galaxy III & John Shaw
![]()
Norsk Hydro
Period: January 17, 2007 - January 22, 2007
Work: R/M of 'Bideford Dolphin' NORCS Fram field
![]()
Shell UK
Period: January 12, 2007 - January 14, 2007
Work: Rig move UKCS GSF Arctic III on Gannet Field (Cancelled)
![]()
Maersk Oil UK
Period: October 23, 2006 - January 9, 2007
Work: FPSO UKCS from Tyne to Dumbarton Field
![]()
BG Group
Period: October 20, 2006 - October 23, 2006
Work: Wire changeout GSF 140
![]()
Maersk Oil UK
Period: October 13, 2006 - October 15, 2006
Work: Rigmove NTVL Griffin Field UKCS
![]()
Maersk Oil UK
Period: October 13, 2006 - October 16, 2006
Work: Rigmove NTVL Griffin Field UKCS
![]()
Oilexco
Period: October 10, 2006 - October 13, 2006
Work: Rig moe UKCS From Block 21/23 to 22/2
![]()
Statoil
Period: October 2, 2006 - October 13, 2006
Work: R/M of 'Borgland Dolphin' NORCS Infield on Statfjord, then West Epsilon
![]()
BG
Period: September 18, 2006 - September 25, 2006
Work: R/M of 'GSF 140' UKCS block 14/27 to North Channel block 28/5
![]()
Transocean
Period: September 10, 2006 - September 12, 2006
Work: Rig move Transocean Rather UKCS Invergordon
![]()
Peak
Period: September 7, 2006 - September 9, 2006
Work: Cargo run UKCS
![]()
Peak Group
Period: August 31, 2006 - September 3, 2006
Work: Rig move Bredford Dolphin UKCS From Block 205/24 to 14/18
![]()
Norsk Hydro
Period: September 3, 2006 - September 7, 2006
Work: R/M of 'Bideford Dolphin' NORCS Oseberg
![]()
Island Oil & Gas/Lundin
Period: August 1, 2006 - August 17, 2006
Work: Rig move Petrolia IRLCS From Irish block 49/23 to block 13/12
![]()
Shell UK
Period: July 28, 2006 - August 1, 2006
Work: Rig move Ocean Guardian UKCS Infield
![]()
Peak Group
Period: August 17, 2006 - August 21, 2006
Work: R/M of 'Bredford Dolphin' UKCS From 211 to 205 'Hurricane'
![]()
BG
Period: August 24, 2006 - August 27, 2006
Work: R/M of 'GSF 140' UKCS Infield on Moonraker 14/28
![]()
Maersk Oil UK
Period: July 20, 2006 - July 27, 2006
Work: Rig move NTVL UKCS From block 15/20 to 9/18
![]()
Shell UK
Period: July 17, 2006 - July 20, 2006
Work: Chain/mooring repairs FPSO Anasuria. UKCS
![]()
Acergy
Period: June 22, 2006 - July 10, 2006
Work: Support FPSO UKCS Leadon Field to Tyne
![]()
Shell UK
Period: June 1, 2006 - June 18, 2006
Work: Mooring of TO Rather UKCS Benbecula
![]()
CNR / ADTI
Period: May 23, 2006 - May 31, 2006
Work: R/M of 'Borgsten Dolphin' UKCS Lyell field to Schooner
![]()
Talisman Expro
Period: May 8, 2006 - May 13, 2006
Work: Rig move GAII UKCS 22/18
![]()
Norsk Hydro
Period: May 4, 2006 - May 6, 2006
Work: Cargo duties. NORCS
![]()
Oilexco
Period: May 14, 2006 - May 16, 2006
Work: RM of 'Bredford Dolphin' UKCS 21/23 to 14/21
![]()
Shell UK
Period: May 3, 2006 - May 4, 2006
Work: R/M of 'Sedco 711' (cancelled) UKCS
![]()
BP Norge
Period: April 22, 2006 - May 2, 2006
Work: Rig move West Epsilon NORCS Valhall field - Thereafter Shell 2/5
![]()
Team Marine
Period: April 18, 2006 - April 22, 2006
Work: Rig move J.W. McLean Block 15/3 UKCS
![]()
Oilexco
Period: April 7, 2006 - April 14, 2006
Work: Rig move Bredford Dolphin Block 15/22 to 21/23 UKCS
![]()
ConocoPhillips
Period: March 24, 2006 - April 5, 2006
Work: Supply duties. NORCS
![]()
Total E & P UK Plc.
Period: March 17, 2006 - March 20, 2006
Work: Rig move of Jack-up Rowan Gorilla V UKCS in field block 22
![]()
Nexen
Period: March 5, 2006 - March 17, 2006
Work: R/M of 'John Shaw' UKCS Fm block 12/14 to 20/6
![]()
Esso Norge
Period: February 27, 2006 - March 5, 2006
Work: Supply duties NORCS Sleipner & Balder
![]()
Statoil
Period: February 21, 2006 - February 26, 2006
Work: Supply duties NORCS Gudrun field
![]()
Talisman
Period: February 3, 2006 - February 21, 2006
Work: R/M of 'Borgholm Dolphin' UKCS Montrose
![]()
BP UK
Period: January 26, 2006 - January 30, 2006
Work: R/M of 'GA IV' UKCS From Machar to Mirren
![]()
Maersk Oil
Period: January 16, 2006 - January 22, 2006
Work: R/M of 'NTVL' UKCS from 22/12 to 15/20
![]()
BP UK
Period: December 7, 2005 - December 24, 2005
Work: R/M of 'Transocean Rather' UKCS Foinaven field 204/24a-A15 to Clair field 206
![]()
BG Group
Period: November 29, 2005 - December 7, 2005
Work: R/M of 'Sedco 714' UKCS From 16/29c-4 May to 22/05b + BP UK
![]()
Nexen Petroelum (UK) Ltd
Period: November 22, 2005 - November 24, 2005
Work: R/M of 'Sedco 712' (R/M cancelled due to weather) UKCS From 15/22 to 21/4
![]()
Statoil ASA
Period: November 3, 2005 - November 5, 2005
Work: C/R to Gullfaks C NORCS Gullfaks
![]()
Venture
Period: November 16, 2005 - November 21, 2005
Work: R/M of 'Sedco 704' UKCS From 16/12 to 21/19
![]()
Statoil ASA
Period: October 23, 2005 - November 2, 2005
Work: R/M of 'Transocean Leader' NORCS Gudrun field
![]()
Landskrona Yard, Sweden
Period: October 17, 2005 - October 22, 2005
Work: Annual docking Sweden
![]()
BP (UK)
Period: October 4, 2005 - October 15, 2005
Work: R/M of 'GSF Arctic IV' UKCS from 16/28 F2 Farragon to 22/24 Marnock field
![]()
BP UK
Period: September 27, 2005 - October 3, 2005
Work: C/R to Clair Field UKCS to Clair field
![]()
Petrofac Facilities Management
Period: September 23, 2005 - September 26, 2005
Work: C/R to 'Thistle Alpha' UKCS to Thistle field 112
![]()
BG International
Period: September 19, 2005 - September 22, 2005
Work: R/M of 'Sedco 714' UKCS From Heather field 2/05 to 16/12
![]()
ADTI
Period: September 18, 2005 - September 19, 2005
Work: R/M of 'Sedco 714' UKCS from Heather field 2/05 to 16/12
![]()
Peak Well Management Ltd
Period: September 13, 2005 - September 18, 2005
Work: R/M of 'Bredford Dolphin' UKCS from 23/11-4 to 3/28
![]()
Team Marine
Period: September 4, 2005 -
Work: R/M 'Borgsten Dolphin' UKCS 3/4a-MS19 (Peak 13/9)
![]()
BG Group
Period: August 27, 2005 - August 30, 2005
Work: R/M of SS Flotel 'Port Reval' UKCS 22/5
![]()
BG Group
Period: August 20, 2005 - August 23, 2005
Work: C/R to 'Encso 70' UKCS Rough Gas Field 47/3b-A2u
![]()
Team Marine
Period: August 16, 2005 - August 18, 2005
Work: C/R Heavy lift UKCS to 'Triton FPSO' 21/30
![]()
Kerr McGee
Period: August 5, 2005 - August 8, 2005
Work: R/M of 'Transocean John Shaw' UKCS from 20/4 to 29/15
![]()
Venture Production
Period: August 9, 2005 - August 15, 2005
Work: R/M of 'Sedco 704' UKCS 21/19-9
![]()
Nexen Petroleum (UK) Ltd
Period: August 2, 2005 - August 5, 2005
Work: R/M of 'Transocean John Shaw' UKCS from 20/4 to 29/15
![]()
Team Marine
Period: July 18, 2005 - July 27, 2005
Work: R/M of 'Borgsten Dolphin' UKCS Invergordon to 3/4a Strathspey
![]()
Norsk Hydro Produksjon AS
Period: June 3, 2005 - June 4, 2005
Work: R/M 'Deepsea Trym' NCS 31/2-F2
![]()
Total UK
Period: May 25, 2005 - May 28, 2005
Work: R/M 'Stena Spey' UKCS
![]()
Nexen Petrolium (UK)
Period: May 23, 2005 - May 25, 2005
Work: R/M 'Stena Spey' UKCS
![]()
Statoil DST BMG
Period: April 24, 2005 - May 20, 2005
Work: Supplyduties NCS
![]()
BG Group
Period: April 19, 2005 - April 20, 2005
Work: C/R from Sedco 714 to Aberdeen UKCS
![]()
Norsk Hydro Produksjon AS
Period: April 14, 2005 - April 19, 2005
Work: R/M 'Deepsea Delta" NCS
![]()
BP UK
Period: March 31, 2005 - April 2, 2005
Work: R/M 'GA IV' UKCS
![]()
Petro-Canada UK Ltd
Period: March 29, 2005 - March 31, 2005
Work: R/M 'GA IV' UKCS
![]()
Statoil ASA
Period: March 8, 2005 - March 25, 2005
Work: C/R and R/M 'Borgland Dolphin' NCS
![]()
Conoco Phillips Norge
Period: March 2, 2005 - March 8, 2005
Work: C/R Ekofisk NCS
![]()
Stolt Offshore UK Ltd
Period: July 14, 2005 - July 16, 2005
Work: Anchor Recovery UKCS Total Forvie North 3/15
![]()
Maersk Oil & Gas
Period: July 9, 2005 - July 12, 2005
Work: Cargo run to 'Noble Byron Welliver' DKCS Tyra field
![]()
Statoil ASA
Period: July 1, 2005 - July 9, 2005
Work: R/M 'Transocean Arctic' NORCS 6608/10-h1 Norne
![]()
Transocean/Nexen
Period: June 27, 2005 - July 1, 2005
Work: R/M Sedco 712 UKCS 712 15/24b-8 to 15/18b-11
![]()
Statoil DST BML
Period: June 4, 2005 - June 15, 2005
Work: Supply / Storage Duties 'Scarabeo 5' NORCS Aasgard Field
![]()
Talisman Energy (UK)
Period: April 11, 2005 - April 14, 2005
Work: R/M of 'Ocean Princess' UKCS
![]()
Statoil DST BML
Period: February 23, 2005 - February 28, 2005
Work: R/M 'West Alpha' NORCS 6506/12 Infield Kristin P to N
![]()
BP Norge
Period: December 23, 2004 - January 28, 2005
Work: C/R to Valhall NORCS 2/8 Valhall Field
![]()
Esso Norge AS
Period: December 4, 2004 - January 21, 2005
Work: Supply / Storage Duties Ringhorne NORCS
![]()
Pertra AS
Period: November 6, 2004 - November 8, 2004
Work: R/M of Mærsk Giant NORCS 15/12 Varg Field
![]()
Statoil DST BML
Period: September 12, 2004 - October 3, 2004
Work: Supply / Storage Duties NORCS Snorre Field
![]()
Statoil DST BML
Period: November 19, 2004 - November 27, 2004
Work: R/M of Borgland Dolphin NORCS 34/10-F2 to Stavanger
![]()